| Day 100: One hundred days since contract signing. Framing continued in the 
      living room finishing up a few areas. The rough in framing was done for the side window
      that looks out over the porch. A lot more work was done demolishing the bathroom. | 
|   2024_08_06_-_Living_room_framing-Rough_in_plumbing-Day_2-1280x720v30.mp4 140.74 MB |   VID_20240806_134138801.mp4 70.49 MB | 
|   VID_20240806_134325240.mp4 191.81 MB |   VID_20240806_134549425.mp4 1638.75 MB |