| Day 114: A roof was installed on the bay window. Foam board insulation 
      installation was completed on the original house exterior 2x4 walls.
      Starter rails for siding were installed around the house. Electrical
      wiring continued for the 2nd day. | 
|   2024_08_20_-_Roofing_bay_window-Siding_prep-1280x720v30.mp4 317.02 MB |   IMG_20240820_143314753.jpg 3.75 MB | 
|   IMG_20240820_143337029.jpg 3.66 MB |