| Day 143: Sept 18th of the home renovation project was busy on the site. The drywall
      was delivered. That's an interesting time lapse video to watch. A little bit of HVAC
      was done to install the duct for the microwave exhaust van. Rich and Kevin framed a
      box around that. Electrical work was done on the outdoor and indoor panels. Also
      today Rich and Kevin installed the lally columns in the crawl space. |