| Day 144: Today is Sept 19th of the home renovation project. Drywall installation
      started today. The crew of two worked very fast. With one on stilts and the other
      on a ladder they lift those 16 foot lengths of drywall up 9 1/2 feet to the ceiling
      and screw them in place. It was really something to see, and you can in the time 
      lapse video. The electricians were also here today working on the power meter box
      on the outside and the new breaker box in the basement. |