| Day 206: On Nov 20th of the home improvement project Rich and Kevin
      did final painting. Cody and Rigo of ANCO Plumbing and Heating
      connected faucets and drains in bathroom and kitchen. The shower fixtures
      were installed and shower drain. They also ran black pipe for gas to the dryer
      and the range. Cody needs to come back tomorrow to finish work on the
      gas lines. Rich and Kevin moved the washer and dryer into
      the laundry room and ran the dryer exhaust through the crawl
      space. We're getting very close to done! 
 
 |